| City of Bakersfield |
The scope of this project includes retrofitting approximately 12,000 linear feet of existing Proto II block walls, including removal of existing wall caps, inspection and correction of any deficiencies, i.e. missing hardware, loss of residual torque, etc.


| City of Palm Desert |
The scope of this project includes constructing approximately 800 linear feet of reinforced concrete block walls, including wrought iron panels, one vehicle access gate and one pedestrian access gate.


| Los Angeles County MTA |
The scope of this project includes demolition of existing concrete structures, removal of existing landscaping, construction of new CMU retaining walls, installation of new AC pavement, installation of electrical conduits and new lighting poles, and other appurtenant work.


California. USA
3334 Barne Circle
Glendale, CA 91208
Phone: 818.236.3633
Fax: 818.236.3634
info@parsamcorp.com

  • City of Palm Desert
75-510 Fred Waring Dr., Palm Desert, CA 92260
Project Name: CVWD Off-Site Well Site Improvements
Description: Reinforced concrete block walls, installation of 12” DIP, site grading, and other appurtenant work
Project Value: $257,000 (100% Parsam)
Estimated Completion Date: 2012

The scope of this project includes constructing approximately 800 linear feet of reinforced concrete block walls, including wrought iron panels, one vehicle access gate and one pedestrian access gate. The scope also includes installing approximately 300 linear feet of 12” diameter ductile iron pipe, and approximately 100 linear feet of 6” diameter ductile iron pipe, including all fittings. There also is approximately 45,000 square feet of site grading and construction of various equipment-mounting pads, and other appurtenant work.


  • State of California, Dept. of Parks & Recreation
One Capital Mall, Suite 410, Sacramento, CA 95814
Project Name: Carpinteria State Beach ADA Improvements
Description: Construct new Comfort Station Building and Ramadas and other appurtenant work
Project Value: $1,039,000 (100% Parsam)
Estimated Completion Date: June 2012

The scope of this project includes the demolition of two existing comfort stations and two ramadas and the construction of a single new comfort station and two new ramadas, which will be fully ADA compliant. The project is located at Carpinteria State Beach and will provide an all new, ADA compliant picnic and rest area for beach goers. The work also includes installation of all new electrical components and upgrades, plumbing and fixtures other related work. The site will also be receiving new ADA compliant picnic tables and barbeques.